Notices to Mariners

M069-19 Port of Devonport – Minimum Depths

Notice No.
M069-19
From
To
Expired

Depths at Port of Devonport following Bed Levelling Programme January 2019.  The maximum draft for Port of Devonport is 9.0m.

Region                         Minimum Depth

Main Channel                9.1m

Swing Basin                    8.5m

No. 1 West                      9.4m

No. 3 West                      6.8m    (180m to 280m)

No. 4 West                      7.7m    (0 to 180m)

No. 5 West                      5.4m

No. 1 East                        6.9m

No. 2 East                        9.3m

No. 3 East                        8.2m up to 30m from Ramp

 

M069-19 is now cancelled.    Refer M152-19