Notices to Mariners

M003-19 Port of Devonport – Minimum Depths

Notice No.
M003-19
From
Active

Following a recent Hydrographic survey, the following minimum depths should be applied to the Port of Devonport:

Berth                              Minimum Depth

Entrance                          9.1m

Main Channel                8.9m

Swing Basin                    8.0m

No. 1 West                      8.2m

No. 4 West                      7.5m

No. 5 West                      5.0m

No. 1 East                        6.3m

No. 2 East                        8.7m

No. 3 East                        8.2m up to 20m from Ramp

5.4m adjacent to Ramp

 

M36-17 is now cancelled.